MSD News

page_1.jpg

 

 

 

 

 

 

 

 

Copy of MSD Portfolio available to download

 





Lost Password?
MSD arrow Overview

MSD uses an Integrated Management System that has been written to demonstrate compliance with the requirements of Network Rails Railway Safety Case Section 11, and the guidance in Network Rail Company Specification NR/SP/OHS/008 - Contract Requirements - Safety and NR/SP/ENV/015 Network Rail Contract Requirements - Environment. In producing the Contractor’s Integrated Management System, the Company seeks to demonstrate it's will, commitment and capability to work on Network Rail owned or controlled Infrastructure considering all safety, quality and environmental requirements.

The Company aims to provide a highly professional service to the railway industry, tailored to meet the exact requirements of clients, by providing personnel who have a proven record of knowledge and competence in their particular area of specialty.

The Company is totally committed to working safely in the railway environment with a strong emphasis on Health & Safety, training of employees and quality assurance.

The Company has passed through the ‘V2 Audit’ with the UK Rail Industry’s supplier development scheme, in the following ‘Link Up’ categories.

The Company is presently working towards ISO 9001: 2000 with expected accreditation in 2009

 

50 Core Audit Module (Trackside)

0603.1001.SER Security Services - SER

0702.1001.SER On Track Protection & Warning Services (PC, ES, COSS, Site Warden, Auxiliary Staff, ATWS Operator, Lookout & Temporary A

0702.1002.SER Machine/Crane Controllers - SER

0704.1002.SER Vegetation Management (On Network Rail Controlled Infrastructure) - SER

0704.1003.SER Vegetation Management (Off Network Rail Controlled Infrastructure) - SER

0710.1001.SER Litter Clearance (On Network Rail Controlled Infrastructure) - SER

0710.1002.SER Litter Clearance (Off Network Rail Controlled Infrastructure) - SER

0711.1001.SER Scrap Clearance (On Network Rail Controlled Infrastructure) - SER

0711.1002.SER Scrap Clearance (Off Network Rail Controlled Infrastructure) - SER

0712.1001.SER Fly Tipping Removal (On Network Rail Controlled Infrastructure) - SER

0712.1002.SER Fly Tipping Removal (Off Network Rail Controlled Infrastructure) - SER

0801.1002.CBD Foundations (Conventional) - CBD

0807.1005.CBD Authorised Walking Routes & Access Points - CBD

0807.1005.MRC Authorised Walking Routes & Access Points - MRC

0807.1006.CBD Paths & Safe Cess - CBD

0807.1006.MRC Paths & Safe Cess - MRC

0808.1001.CBD Road & Pathway Dressings - CBD

0808.1001.MRC Road & Pathway Dressings - MRC

0808.1002.CBD Car & Cycle Parks - CBD

0808.1002.MRC Car & Cycle Parks - MRC

0808.1003.CBD Roadways - CBD

0808.1003.MRC Roadways - MRC

0885.1001.SER Contingent Labour (Building Works) - Sentinel Registered - SER

0885.1002.SER Contingent Labour (Building Works) - Non Sentinel Registered - SER

1205.1002.CBD Masonry Structures (Including Brickwork) - CBD

1205.1002.MRC Masonry Structures (Including Brickwork) - MRC

1205.1003.CBD Reinforced Concrete Structures - CBD

1205.1003.MRC Reinforced Concrete Structures - MRC

1206.1001.CBD Cable Route Works (Including Troughing & Ducts) - CBD

1206.1001.MRC Cable Route Works (Including Troughing & Ducts) - MRC

1207.1001.CBD Masonry Structures - CBD

1207.1001.MRC Masonry Structures - MRC

1207.1002.CBD Concrete Structures (Mass & Reinforced) - CBD

1207.1002.MRC Concrete Structures (Mass & Reinforced) - MRC

1207.1003.CBD Reinforced Earth Structures - CBD

1207.1003.MRC Reinforced Earth Structures - MRC

1207.1004.CBD Gabion Walls - CBD

1207.1004.MRC Gabion Walls - MRC

1285.1001.SER Contingent Labour (Civils) - Sentinel Registered - SER

1285.1002.SER Contingent Labour (Civils) - Non Sentinel Registered - SER

1401.1003.CBD Foundations - CBD